A four-hour 128-MW battery energy storage system was recently completed on Robins Air Force Base in Warner Robins, Georgia. The 512-MWh system, when paired with the nearby Robins Solar Facility, strengthens energy resilience within Georgia Power utility territory.

Pictured from left to right: Bowen Shoemaker – Georgia Power Region Executive, Mayor Lester Miller – Macon Bibb County, Representative Anissa Jones – Georgia House of Representatives, Rick Anderson – Georgia Power Senior Vice President and Senior Production Officer, Senator David Lucas – Georgia State Senate, Senator Steven McNeel – Georgia State Senate, Colonel Johari Hemphill – Robins Air Force Base, Chairman James Vaughn – Central Georgia Joint Development Authority, Senator Larry Walker – Georgia State Senate
“Seeing the Robins Battery Facility enter commercial operation is an important milestone for Georgia Power and for the future of energy in our state,” said Rick Anderson, senior vice president and senior production officer for Georgia Power. “By pairing battery storage with solar generation, we’re creating a more flexible and resilient grid that can respond to customer needs during periods of peak demand while supporting Georgia’s continued growth. Projects like this demonstrate how we are thoughtfully investing in innovative technologies and working alongside strong community and industry partners to deliver reliable, affordable energy for decades to come.”
Burns & McDonnell served as the engineering, procurement and construction contractor for the Robins Battery Facility and delivered the project on schedule.
The Robins Battery Facility is one of four battery energy storage projects being developed by Georgia Power. The utility has completed battery storage facilities in Cherokee and Lowndes counties totaling 579.5 MW and is nearing completion of a 57.5-MW facility in Floyd County.
News item from Georgia Power




Tell Us What You Think!