Unirac has a new shared-rail version of its Ground Fixed Tilt (GFT) system. The new shared-rail design delivers system and labor optimization for maximum productivity.
Unirac’s commercial project support makes construction easy, from permitting through installation, including region-specific engineering and documentation. Kitted hardware, pre-assembled parts, integrated bonding, lightweight components and straightforward connections allow for one- or two-person assembly, and no specialized labor or training is required.
System flexibility enables the mounting of both 60- and 72-cell modules and offers multiple foundation options. The shared-rail GFT system also comes with a 25-year warranty.
Unirac will begin accepting orders for this new GFT system on April 18, 2018.
News item from Unirac
Tell Us What You Think!