Inovateus Solar, an installer of commercial and industrial solar power systems (No. 29 on the Solar Power World Top 250 Solar Contractors list), has embarked on a rooftop solar array project that will be installed on McElroy Metal’s Peachtree City, Georgia manufacturing location as part of the Medium Scale Georgia Power Advanced Solar Initiative Program.
Construction on the project begins the week of September 29, 2013. The 500 kW array is scheduled to be commissioned before Christmas of this year. A live construction camera of the project will be available at the Inovateus Solar website to view the progress.
This 500 kW project will be installed on the roof and on a canopy in McElroy’s parking lot. “It is the largest solar installation for a metal roofing manufacturer,” stated Inovateus Solar Project Manager, Peter Rienks. “McElroy is really stepping up to the plate to incorporate renewables into their product offering.”
McElroy has 12 manufacturing facilities across the U.S. Through its partnership with Inovateus Solar, McElroy now manufactures ready to install solar panels fully integrated into steel panel systems and offers solar kits with their metal roof
Tell Us What You Think!