GameChange Racking has announced the availability of the GC Pour-in-Place Ballasted Ground System in a 2-Up configuration.
The Pour-in-Place system utilizes self-leveling technology to ensure rapid installation. In order to meet customer requirements for landfills needing wide row spacing, we have now introduced a 2-Up in portrait version of the system. This will allow the Pour-in-Place system to be installed in a variety of new locations quickly and cost-effectively.
Features of the GC Pour-in-Place Ballasted Ground System, according to GameChange Racking:
- Self-leveling technology: 68% faster install than precast
- Large ballast footprint reduces landfill cap loading
- Wind tunnel tested and rated for 120 mph wind speed
- Now available in both 1 and 2 panels up portrait
- 51% overall lower cost than competitors
Derick Botha, Director of Business Development at GameChange Racking, says: “GameChange is constantly striving to change the solar racking game. We listened to our customer’s concerns regarding wide row spacing and have tailored a 2-Up portrait version of our Pour-in-Place ballasted ground system to meet their requirements. This innovation is just a small part of our ongoing commitment to making solar racking easier and more cost-effective.”
GameChange Racking
www.gamechangeracking.com
Tell Us What You Think!